Zetaly Resource Planning
    • 09 Nov 2023
    • 1 Minute to read
    • Contributors
    • Dark
      Light

    Zetaly Resource Planning

    • Dark
      Light

    Article summary

    Presentation

    The overall aim of capacity planning is to ensure that the ever-changing nature of a company’s IT infrastructure can handle the constantly evolving nature of the company’s needs for that infrastructure.

    The need is three-fold:

    • Input business, economical or technical change hypotheses
    • Simulate activity projections to determine future capacity needs
    • Get hardware, urbanism & budget plan

    Capacity planning benefits include:

    • The potential to defer expenditure, realizing the difference in cost between panicked buying and planned buying
    • The minimizing of application risks and the risks associated with application sizing
    • The reduction or elimination of the resource expenditures needed for emergency capacity expansions

    Current limitations

    • No comparison between before/after an event is added
    • No events related to soft capping (regression from CCPT)

      System requirement : for large simulations, RAM is used a lot (≈ 0.35MB/ReportClass/Day, with 50 ReportClass over a 1 year simulation, you will need about 6GB of ram).

    ZRP Process

    Data loading:

    • Initialize data in ZRP from the ZETALY database
    • This data will become available for every project

    Project creation:

    • Creation of a new project with a custom name
    • Selection of resources to include: CPCs, LPARs
    • Selection of the reference period in the previously initialized data

    New simulation:

    • Definition of the name & projection period (1 month in the future, 1 year, 3 years...)

    Add events:

    • List of available events: 
      • Act./Deactivate CPC
      • Act./Deactivate LPAR
      • Act./Deactivate report class
      • Move report class in time
      • Move report class on another LPAR/CPC
      • Increase report class activity - at a specific time & date or an increase over a period of time

    Run simulation:

    • Calculate future activity from added events
    • Visualize simulation results CPC by CPC or LPAR by LPAR

    Data Loading Details

    Note: Depending on the amount of data you load, the SMF import can take a few minutes. For more details, see SMF Reference.

    After the import, you can visualize the data:

    Project

    Create your project:

    Simulation And Events

    Create a simulation:

    You can add an event from the menu, or directly on the event panel :

    You can run the simulation of a CPC individually (with or without events): 

    You can explore your simulation by clicking on its name or any of its CPCs/LPARs, and looking through the Charts or Synthesis board tabs.





    What's Next
    Changing your password will log you out immediately. Use the new password to log back in.
    First name must have atleast 2 characters. Numbers and special characters are not allowed.
    Last name must have atleast 1 characters. Numbers and special characters are not allowed.
    Enter a valid email
    Enter a valid password
    Your profile has been successfully updated.